The War Room will be the most visible building on our campus as it will be the first structure those entering will see. It is a visible reminder of God’s faithfulness to this generation of students and all those who’ve come before them. It will be a place to gather with a small group of people to pray for God’s blessing and favor over the LCA campus and the students and families entrusted to us, for both corporate and personal needs. Families can also utilize the War Room as a place to gather and pray. It stands as a reminder that we are indeed in a battle for the hearts and minds of students as we strive to instill a biblical worldview predicated on God’s Word. LCA’s story is founded on the premise of prayer and this building will be a landmark representation of our dependence upon Him and our surrender to His purposes. 

Estimated Cost: $500,000


Spanning 55,000+ square feet, this newest addition to our Upper School program will feature the latest in technological advances, house collaborative work space for students, incorporate a state of the art STEM lab as well as a fully functioning Internet Technology suite and an interactive Media Center. Tailored to meet the needs of the 21st century learner, students will receive vital instruction in critical thinking, creativity, innovation and collaboration. The renovation of our current 33,000 square foot Upper School building will allow our PreK-5th grade students along with all of their specials classes to be housed underneath the same roof. Aesthetic upgrades will create an environment which fosters the natural curiosity of our youngest learners.

Estimated Cost: $5 Million


Along with our commitment to excellence in education in the areas of Science, Engineering, Technology and Math, LCA is also passionate about exposing our students to the beauty of fine arts and allowing them to explore their own gifting in the areas of Band, Chorus, Theater and the many expressions of Visual Arts. This state of the art facility will provide classrooms for each of these course offerings as well as an 1,100 seat theater outfitted with the finest production and technology resources. The theater will be the location of all on-campus productions at LCA including Theater programs, Band and Choral programs, the Lower School Musical and High School Graduation, to name a few.

Estimated Cost: $4 Million


LCA always desires to improve the campus experience by placing students in an environment that inspires excellence. Some upcoming campus improvements will include:

  • the paving of the track surrounding our football field
  • the installation of a secondary entrance at the back of the campus
  • the addition of a field house containing, concessions, locker rooms and restrooms.
  • other beautification projects